DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-100display system-parameters duplication
8
display system-parameters duplication
This command displays the status (enabled or disab led) of Switch Processing
Element (SPE) and Port Network Connectivity (PNC) duplication. The following
must be duplic ated:
Each switch node record and every switch node with its d uplicate (cab inet
administration is a prerequisit e)
Every fiber link containing either an exp ansion interface circuit p ack as an
endpoint, or a DS1-C (fiber link ad ministration is a prerequisite; c ircuit
pack administration then f ollows duplication ad ministration)
All nonduplicated switch node interfac es (SNI) to SNI fiber links are automatically
duplicated.
NOTE:
You must enable (y) the PNC Duplication field on the customer options
form (change system-parameters customer-options) before you can do
any duplication ad ministration.
PNC Duplication cannot be en abled until all pnc -a and pnc-b boards are
released from the “busyout” state.
display initcauses
INITIALIZATION CAUSES
Cause Action Escalated Carrier Time
Initialized 4 no 1A 06/01 7:14
Scheduled Interchange i no 1B 06/02 2:00
Scheduled Interchange i no 1A 06/03 2:00
Scheduled Interchange i no 1B 06/04 2:00
Scheduled Interchange i no 1A 06/05 2:00
Scheduled Interchange i no 1B 06/06 2:00
Scheduled Interchange i no 1A 06/07 2:00
Scheduled Interchange i no 1B 06/08 2:00
Scheduled Interchange i no 1A 06/09 2:00
Scheduled Interchange i no 1B 06/10 2:00
Scheduled Interchange i no 1A 06/11 2:00
Interchange 1 no 1B 06/11 12:14
Craft Request i no 1A 06/11 15:40
Craft Request i no 1B 06/11 16:33
Scheduled Interchange i no 1A 06/12 2:00
Scheduled Interchange i no 1B 06/13 2:00
Command successfully completed