DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-38ADX16A-PT (AUDIX Analog Line/Control Link)

9
Looparound Test (#161)
This test is designed to ch eck the on-board transmission c apabilities of the NPE on the analog port.
2000 ABORT Response to the test request was not received within the allowable time period.
2100 ABORT Could not allocate the necessary system resources for this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Any FAIL The NPE of the tested port did not conference the tones correctly. This causes
noisy and unreliable connections.
1. Replace the c ircuit pac k.
PASS The port can correctly conference multiple connec tions. User-reported troubles
on this port should be investigated by using other port tests and by examining
station, trunk, or external wiring .
Table 9-15. TEST #161 Looparound Test
Error
Code Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources for this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may be
busy with a valid call.
1. Use the display port UUCSSpp command to determine the station
extension. Use the status station command to determine the service
state of the port. If the port is in use, wait until it is idle before testing.
2. If the port status is idle, retry the command at 1-minute intervals for a
maximum of 5 times.
1002 ABORT The system could not allocate time slots for the test. The system may be
under heavy traffic conditions or it may have time slots out-of-service due to
TDM-BUS errors.
1. If system has no TDM-BUS errors and is not handling heavy traffic, retry
the command at 1-minute intervals for a maximum of 5 times.
Continued on next page
Table 9-14. TEST #7 Conference Circuit Test — Continued
Error
Code Test
Result Description/Recommendation
Continued on next page