DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-134ASAI-EPT
9
2012 ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1113 FAIL The signaling link is not "bound" to the adjunct. For ASAI adjuncts this error
indicates that the link is disconnected at Layer 2. Since the signaling link
associated with the endpoint has been identified by ad ministration, the link
is only "unbound" from the endpoint when it is disconnected.
1. Execute the status bri-port UUCSSpp command and refer to the
associated procedures for this command contained in “ BRI-PORT”.
PASS The signaling link is connected at Layer 2 and "bound" to the ASAI adjunct.
Table 9-52. TEST #626 Signaling Link Status Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page