9-252ATM-SYNC (ATM Synchronization)

9
Session Restart Test (#1287)
This test is destructive.

This test attempts to restart those sessions that are down on the PPP link. The

test runs only on demand as a part of test port UUCSSpp long command.

Table 9-108. TEST #417 Test Synchronization Test
Error
Code Test
Result Description/ Recommendation
1000 ABORT System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 3 times.
1115 ABORT Could not allocate the nec essary system resources to run this test .
2500 ABORT Internal system error
PASS The synchronization maintenance component circuit pack parameters have
been successfully updated. The system should be synchronized after
successful execution of this test.
1. If synchronization problems still exist, refer to the Error Log to obtain
information regarding the source of the problem.
Continued on next page
Table 9-109. TEST #1287 Session Restart Test
Error
Code Test
Result Description/ Recommendation
1125 ABORT PPP Li nk is not in serv ice.
1. Check if the PPP link is in-service or not. If the link is not in service,
release the link (release link
n
or the release port UUCSSpp) and
repeat the test. This is a normal abort.
2000 ABORT Response to the test was not received from the C-LAN circuit pack within
the allowable time period.
1. If this result occurs repeatedly, attempt to reset the circuit pack if the
other ports on the board are not in use (Yellow LED is off). Reset the
circuit pack by issuing the busyout board UUCSS and the reset
board UUCSS commands.
2. If this result occurs again, replace the circuit pac k.
2100 ABOR T The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.