DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-291AUX-TRK (Auxiliary Trunk)
9
System Technician-Demanded T ests: Descripti ons
and Error Codes
Always investigate tests in the order p resented in the table below when
inspecting errors in the sys tem. By clearing error cod es associated with the
Looparound and Conferenc e Test,
for example, you may also clear errors
generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the se lected
time slot and never crosses over to time slots rese rved for other connections. If
the NPE is not working correctly, one-way and noisy connec tions may be
observed. This test is part of a p ort’s Long Test Sequence and takes about 20 to
30 seconds to comp lete.
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Looparound and Conference Test (#33) X ND
NPE Crosstalk Test (#6) X ND
Diagnostic Test (#114) X X ND
Audit Update Test (#36) X X ND
Table 9-132. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times
1000 ABORT System resources required to run test are not available. The port may be
busy with a valid call.
1. Use the display port UUCSSpp command to determine the trunk
group/member num ber of the port. Use the s tatus trunk command to
determine the servic e state of the port. If the p ort is in use, wait until the
port is idle.
2. Retry the command at 1-minute intervals for a maximum of 5 times.
1001 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Continued on next page