DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-35ADX16A-PT (AUDIX Analog Line/Control Link)
9
System Technician-Demanded T ests: Descripti ons
and Error Codes
Always investigate tests in the order p resented in the table below. By c learing
error codes associated with the
Looparound Test #161
for example, you may also
clear errors generated from other tests in the testing sequence.
NO-OP Tests
The maintenance strategy for DEFINITY AUDIX emulates the one for ANL-16-L.
The tests listed below apply only to A NL-16-L and not to DEFINITY AUDIX. T hese
tests always return PASS.
Battery Feed Test (#35)
Audits and Upd ates Test (#36)
Station Present Test (#48)
Tests 36 and 48 ABORT when AUDIX is not running.
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be ob served. This test is
part of the long test seq uence and takes about 25 sec onds to complete.
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Looparound Test (#161) X ND
Conference Test (#7) X ND
NPE Crosstalk Test (#6) X ND
Table 9-13. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Continued on next page