DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-1512STBY-SPE (Standby SPE Maintenance)
9
Table 9-571. TEST #858 Standby SPE Time-of-Day
Comparison Test
Error
Code Test
Result Description/ Recommendation
1000
2029 ABORT Either of these codes indicates that the test cannot run because internal
resources cannot be allocated to read active cloc k.
1. Consult SYSAM service documentation for time-of-day clock tests.
1338 ABORT Test cannot run because a planned SPE interchange is pending.
1. Wait for the planned interchange to complete, then for handshake to come
up, then re-run test on newly standby SPE.
1339 ABORT Test cannot run because handshake communication is not up.
1. Wait 5 minutes and try test again. If handshake is still not up (you get a
1339), solve the handshake problem as described in
Resolving Handshake Failure
1346 ABORT Test could not read standby SPE’s TOD clock.
1. Test standby SPE’s SYSAM and consult that section in this chapter.
1377 ABORT A-carrier SPE’s clock is not moving forward.
1. Test A-carrier SYSAM’s time-of-day clock according to SYSAM service
documentation.
1378 ABORT B-carrier SPE’s clock is not moving forward.
1. Test B-carrier SYSAM’s time-of-day clock according to SYSAM service
documentation.
2000 ABORT Effort to read the clock timed out.
1. Test ea ch of the two SPE’s SYSAMs (t est mai nt {1a| 1b}) a s desc ribe d in
SYSAM serv ice d ocume ntati o n. Onc e thes e all p ass, re p eat t his tes t.
FAIL Standby TOD clock differs from active’s by more than 20 seconds.
1. Wait 1-minute; repeat the test. If test passes, there is no problem.
2. If test fails, use the loc k-power-down ap proach to replac e the TN1648
SYSAM cir cuit p ack on the s tandb y SPE. Aft er the r epair ed sta ndby SPE is
fully initialized (handshake has been re-established), repeat the test.
3. If the test fails ag ain, run it again it 1-minute la ter. If it fails again, pe rform a
planned SPE interchange and wait for it to complete, Replace the standby
SYSAM pac k with anoth e r new re plac ement p ack . Note t hat thi s repai r
procedure requires two extra SYSAM circuit packs.
PASS The two SPE’s TOD clocks are within tolerable limits of one another.
Continued on next page