DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-222status bri-port
8
Table 8-10. Interpreting BRI-Port Status Reports
Error
Type Aux
Data Associated Test Alarm
Level On/Off
Board Test to Clear Value
ASAI,
BRI 0-126 Assigned blank blank This is a transitory state for BRI
endpoints and ASAI ad juncts. The
switch is attempting to establish the link.
1. Check the endpoint and wiring by
following the SPID Facility Test
Procedure describ ed in the BRI-SET
section of Chapter 9.
2. Repeat status bri-port to determine
that the Layer 2 state of the
signaling link is either
L3-Established (for ASAI
adjuncts and BRI endpoints
supporting MIM initialization) or
Established (for fixed TEI BRI
endpoints and automatic TEI BRI
endpoints not supporting MIM
initialization). If it is not, follow
normal escalation p rocedures. (A
MIM or management information
message is a level-3 message that
conveys management and
maintenance information between a
communications system and a BRI
terminal.)
ASAI 0-63 Established blank blank This is a transitory state for ASAI
adjuncts. ASAI signaling is connected at
Layer 2 but the Layer 3 Restart
procedure has not been completed
between switch and adjunct.
1. Check the adjunct by following the
recommended repair procedures of
the manufacturer.
2. Repeat status bri-port and
determine whether the L2 state of
the signaling link is L3-Established.
If it is not, follow normal escalation
procedures.
BRI 0-126 Established ext# blank This is the normal state for non-MIM
initializing, fixed, and automatic TEI BRI
endpoints.
Continued on next page