DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-525DIOD-DS1 (DS1 DIOD Trunk)
9
Conference Circuit Test (#7)
The Conference Circuit Test verifies that the NPE channel for the port being
tested can correc tly perform the conferenc ing function. The NPE is instructed to
listen to several different tones and c onference the tones together. The resulting
signal is then measured by a to ne detector port. If the leve l of the tone is within a
certain range, the test p asses.
FAIL The NPE of the tested port was found to be transmitting in error. This will cause
noisy and unreliable c onnections.
1. Replace the circuit pack.
PASS The port is correctly using its allocated time slots. User-reported troubles on
this port should be investigated using other port tests and examining station,
trunk, or external wiring.
Table 9-214. TEST #7 Conference Circuit Test
Error
Code Test
Result Description/ Recommendation
ABORT System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may be in
use on a valid call.
1. Use the status station or status trunk command to determine when the
port is available for testing.
1004 ABORT The port has been seized by a user for a valid call.
1. Use the status station or status trunk command to determine when the
port is available for testing.
2. Retry the command at 1-minute intervals a maximum of 5 times.
1018 ABORT Test disabled via administration. This only applies to analog stations.
1. To enable test, set the Test field (change station
extension
) to y. Use the
command.
Continued on next page
Table 9-213. TEST #6 NPE Crosstalk Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page