9-494DID-TRK (Direct Inward Dial Trunk)
9
Port Audit Update Test (#36)
This test sends updates of the DID p ort translation for all ports on the c ircuit pack
that have been translated. The upd ate is non-disruptive and g uards against
possible corrup tion of translation data contained on t he circuit pack. No
response message is expec ted from the circuit pac k once it receives translation
updates. The port translation data includes:
Wink or immediate start trunk
Dial tone or rotary dialing trunk
Rotary dialing inter-digit timin g
Network balance R/RC
Disconnect timing
0NO
BOARD The test could not relate the internal ID to the port (no board).
1. Check to ensure that the board translations are correct. Translate the
board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should re-establish the linkage
between the internal ID and the port.
Table 9-203. TEST #36 Port Audit Update Test
Error
Code Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 9-202. TEST #35 Port Diagnostic Test — Continued
Error
Code Test
Result Description/ Recommendation