DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1187PE-BCHL (PRI Endpoint Port)

9
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the se lected time slot and never crosses over to time slots rese rved for other connections. If the NPE is not working correctly, one-way and noisy connec tions may be observed. This test is usually p art of a port’s long tes t sequence and takes a bout 20 to 30 seconds to comp lete.
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit and Update Test (#36) X X ND
Signaling Link State Check Test (#255) X X ND
Service State Audit Test (#256) X X ND
Call State Audit Test (#257) X X ND
Table 9-470. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may be in
use on a valid call. Use status pri-endpoint extension commands to
determine when the port is available for testing.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1001 ABORT Could not alloc ate the necessary system resourc es to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1002 ABORT The system could not allocate time slots for the test. The system may be under
heavy traffic conditions or it may have time slots out-of-service due to
TDM-Bus errors. Use the status health command to determine if the system is
experiencing heavy traffic. Investigate and resolve any errors against
TDM-BUS.
1. If system has no TDM-Bus errors and is not handling heavy traffic, repeat
test at 1-minute intervals for a maximum of 5 times.
Continued on next page