Signaling Link State Check Test (#255)

As noted in the preced ing general desc ription, operation of the PRI endpoi nt port

depends on the health of the U DS1 interface circuit pac k and System Link for

proper operation. This test che cks the status of those critical elements.

Table 9-472. TEST #36 Audit and Update Test
Error
Code Test
Result Description/ Recommendation
ABORT Internal system error
2000 ABORT Response to the test was not received within the allowable time period.
2100 ABORT Could not allocate the necessary system resources to run this test.
FAIL Test failed due to internal system error.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
PASS Port translation has been updated successfully. The current port states kept in
the UDS1 interface circuit pack and switch software are consistent. If the port is
busied out, the test will not run, but will return PASS. To verify that the port is
in-service:
1. Enter status pri-endpoint extension to verify that the port is in-service. If
the port is in-service, no further action is necessary. If the port is
out-of-service, continue to Step 2.
2. Enter release pri-endpoint extension or release port UUCSSpp command
to put port back into in-service.
3. Retry the test command.
Continued on next page
Table 9-473. TEST #255 Signaling Link State Check Test
Error
Code Test
Result Description/ Recommendation
ABORT Internal system error
1. Retry the command at 1-minute intervals for a maximum of 5 times.