DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-1208PGATE-BD (Packet Gateway Circuit Pack)
9
Link Status Test (#601)
This test determines the state of the call c ontrol signaling link for X.25 Packet
Gateways.
This test determines if the signaling link is connected or d isconnected . If the link
is connected, this test c auses a test frame (called an XID frame) to be sent to the
Packet Gateway circuit pac k over the signaling link. The test p asses if the
signaling is connec ted and a test frame resp onse is received by t he switch. The
test fails if the signaling link is d isconnected or no resp onse if received from the
circuit pack.
This test is non-destructive.
PASS Hardware setting and attached cable typ e match Packet Gateway circuit pack
administration.
Table 9-484. TEST #601 Link Status Test
Error
Code Test
Result Description/ Recommendation
2012 ABORT Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2100 ABORT The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2 FAIL The X.25 call control signaling link is disconnected.
1. Reexecute the test 5 times at 1-minute intervals.
2. If the test continues to fail, execute the ‘‘Packet Interface Test’’ to
determine if the problem is due to the circuit pack. If the test fails, see
repair procedures for Packet Interface Test.
3. If the Packet Interface Test passes, then see repair procedures for Packet
Control circuit pack and Packet Bus.
Continued on next page
Table 9-483. TEST #600 Congestion Query Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page