DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-1689TBRI-PT (TN2185 ISDN Trunk-Side BRI Port)
9
1 FAIL Received a status of Level 1 Pendi ng Activation. U interfa ce down
indicating a problem with a connection b etween the switch and the NT1, a
2- to 4-wire converter that is used to connect 4-wire terminals to a 2-wire
TN2198 or TN2185 circuit pack.
1. Verify that the connections between the switch and the NT1 are good.
Verify that the NT1 has power.
2. Execute the test port UUCSSpp command and review the results of
the Level 1 Status Inquiry Test to verify the repair. If this test still fails,
proceed to Step 3.
3. Follow the manufacturers repair procedures for the NT1. Then execute
the test port UUCSSpp command and review the results of the Level
1 Status Inquiry Test to verify repair.
2 FAIL Received a status of Level 1 Pendi ng Activation. U interfa ce up, S/T
interface down, which indicates a problem with the NT1 or the wiring
between the NT1 and the BRI endpoint (S/T interface).
1. Execute the test port UUCSSpp command and review the results of
the Level 1 Status Inquiry test to verify the repair. If this test still fails,
proceed to Step 2.
2. Follow the manufacturer-recommended repair procedures for the NT1.
Then execute the test port UUCSSpp command and review the
results of the Level 1 Status Inquiry test to verify repair.
3 FAIL Received a status of Level 1 Deactivated; the port is out-of-service.
1. Issue the status bri-port UUCSSpp command to verify that the
service state of the port is out-of-service. If the service state of the port
is not out-of-service, escalate the problem to the next tier. Otherwise,
proceed to Step 2.
2. If the port has been placed out-of-service with the busyout port
UUCSSpp command, try releasing the port by exec uting the release
port UUCSSpp command. Then issue the test port long UUCSSpp
command and review the results of Level 1 Status Inquiry test. If this
test still fails, proceed to Step 3.
3. After executing the test port long UUCSSpp command, review the
results of all the tests. Follow the repair procedures for any tests that
fail. Verify repair of the problem by executing the test port UUCSSpp
command and by determining that the Level 1 Status test passes. If
the test continues to fail for this reason, escalate the problem to the
next tier.
Table 9-635. TEST #1242 Level 1 Status Inquiry — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page