DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-351BRI-SET, ASAI-ADJ, BRI-DAT
9
BRI XID Test (#628)
This test checks the D-channel co nnection between the SPE and the endpoint or
adjunct.
In this test, a D-channel XID frame is sent to the endp oint or adjunct over the
point-to-point signaling link. The test passes if the endpoin t or adjunct respond s
with a Layer 2 XID-RESPO NSE fra me
This test must be administered to not run in the sta tion administration form for
ports on a TN2208.
Table 9-153. TEST #628 BRI XID
Error
Code Test
Result Description/ Recommendation
1000 ABORT The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ is busy. The test
cannot be executed at this time:
1. Pause momentarily (30 seconds) and re-execute at this time.
2. If this problem persists, escalate this problem.
NOTE:
A BRI-PORT can also be busy. When using this for
BRI-PORT/ABRI-PORT tests, the words ‘‘BRI-SET, ASAI-ADJ,
ATT-ADJ,’’ can be changed to ‘‘BRI-PORT, ABRI-PORT, ATT-ADJ.’’
1005 ABORT The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects supp ort XID testing, use the
change station extension command to change the
XID Testing ?
field
on the form to y.
1113 ABORT The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp long command to clear any errors which
prevent establishment of t he signaling link.
2. Examine the results of the Signaling Link Status Test (#626) which is run
as part of this command. If this test aborts or fails, follow the repair
procedure for Test #626.
3. If the XID Test #628 continues to abort, escalate the problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
Continued on next page