DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-253ATM-SYNC (ATM Synchronization)

9
PPP Link Status Inquiry Test (#1279)

This no n-de struc tive test d eter mines the s tate o f the PPP l ink. I f the l ink is

connected, this test p asses. The test fails if the PPP link is disconnected.

2500 ABORT Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL All sessions on PPP link are down.
1. Test the port (test port UUCSSpp long) and verify the result of the
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test fails, escalate the problem.
3. If the test passes wait for the sessions to come up.
PASS All se s sions on PPP link a re up .
Table 9-110. TEST #1279 PPP Link Status Inquiry Test
Error
Code Test
Result Description/ Recommendation
1125 ABORT PPP Link is not in service.
1. Check if the PPP link is in-service or not. If the link is not in service,
release the link (release link
n
or release port UUCSSpp) and repeat
the test. This is a normal abort.
2100 ABORT The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2500 ABORT Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL PPP link is down.
1. Test the port (test port UUCSSpp long) and verify the result of the
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test passes wait for the link to come up.
PASS PPP link is up.
Continued on next page
Table 9-109. TEST #1287 Session Restart Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page