8-345test host-adapter
8
Output
When the test is run in the foreground, test results are disp layed in the normal
format. In addition, the messag e line displays a running count of the number of
maintenance objects alread y tested, the total number inc luded in the tests,
percent complete d and repetition count .
The following display shows a typ ical result when test hardware-group system
is entered.
test host-adapter
test host-adapter [C] [short | long] [repeat # | clear] [schedule]
The test host-adapter command performs a series of tests on the host-ad apter
portion of the specifie d MSSNET circuit pack. This command will ab ort if any
other MSS operation has already begun.
Failure of the host-adapter test may result in disab ling access to the host-ad apter
by all system software except ma intenance. Such a failure of the host-adap ter
also denies access to th e related tape and d isk until the host-adapter is fully in
service.
The cabinet is always 1 and need not be entered. Carrier a or b must be
specified only for systems with duplicated SPEs.
test hardware-group system
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C07 ANL-BD 51 PASS
01C07 ANL-BD 52 PASS
01C0703 ANL-LINE 5444 35 PASS
01C0702 ANL-LINE 5447 35 PASS
01C0703 ANL-LINE 5444 48 PASS
01C0701 ANL-LINE 5401 35 FAIL 1000
01C0702 ANL-LINE 5447 48 PASS
01C0703 ANL-LINE 5444 36 PASS
01C0702 ANL-LINE 5447 36 PASS
01C0701 ANL-LINE 5401 48 FAIL 1000
01C0701 ANL-LINE 5401 36 PASS
Testing system, 68 of 342 (19%) MOs tested for repetition 1