DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-63ANL-24-L (24-Port Analog Line)
9
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be ob served. This test is
usually part of the long test seq uence and takes about 20 to 30 seconds to
complete.
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
1. D = Destructive; ND = Nondestruc tive
Battery Feed Test (#35) X X ND
Station Present Test (#48) X X ND
Looparound Test (#161) X ND
Conference Test (#7) X ND
NPE Crosstalk Test (#6) X ND
Station Status and Translation Audits and Updat es
Test (# 36) XXND
Table 9-27. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1000 ABORT System resources required to run test are not available. The port may be
busy with a valid call. This result is also reported for the system’s
Music-On-Hold port when it is off-hook, which it usually is.
1. Enter display port UUCSSpp to determine the station’s extensi on.
2. Enter status station extension to determine the service state of the
port.
3. If the port is in use, wait until the port is idle. Retry the command at
1-minute intervals for a maximum of 5 times.
1001 ABORT System resources required to run test are not available. This could be due
to a failure to seize the port.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
Continued on next page