DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Commands
8-301status signaling-group
8
The following display shows a typ ical result when status signaling-group 1 is
entered.
Level 3
State: The operational state of the primary and s econdary D-channels:
in-service The D-channel is functioning.
standby the link is established but the D-channel is not
currently being used for layer 3 signaling.
wait This is a transitional state in the process of prog ressing to
the in-service state. The switch has sent an ISDN SERVICE
message requesting estab lishment of layer 3 communications,
and is awaiting a SERVICE ACKNOWLEDGE message from the
far end to put the D-channel int o service.
maintenance busy The D-channel is no longer in the
multiple-frame-established state at layer 2. When an active
D-channel in a duplex sig naling group fails, it is p laced into this
state and an interchange to t he standby D-channel takes p lace.
When layer 3 signaling is re-establish ed over the new
D-channel, the failed D-c hannel is moved from this state to
out-of-service and restarted . If the link is successfully
re-established, it is put into the standby state.
manual-out-of-service The link carrying the D-channel has
been busied-out b y command.
out-of-service The D-channel is down.
no-link A link has not been administered for this D-channel on
the signaling-group form.
status signaling-group 1 Page 1 of 1 SPE A
STATUS SIGNALING-GROUP
Group ID: 1
Type: facility associated signaling
Group State: in-service
Primary D-Channel
Link: 1 Port: 01C1924 Level 3 State: in-service
Secondary D-Channel
Link: Port: Level 3 State: