DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-654DS1-FAC (DS1 Facility)

9

If the test passes on a TN1654 DS1 facility, the

round trip delay time

will be

displayed in milliseconds in the

Error C ode

field. The round trip delay time is

defined as the length of tim e in milliseconds it takes for the firmw are to receive

the test pattern after it has been sent.

Figure 9-30. Far-End Internal Loopback Test (#797)

Table 9-256. TEST #797 Far-End Internal Loopback Test
Error
Code Test
Result Description/ Recommendation
2000 ABORT Timed out while waiting for a response from the circuit pack.
2100 ABORT Could not allocate the nec essary system resources to run th is test.
2300 ABORT The downlink message necessary to run this test could not be sent.
2301 ABORT The timer could not be set before sending the downlink message necessary to
run this test.
1. Retry the command at 1-minute intervals a maximum of 3 times.
2316 ABORT Fiber link is not administered. Administer the DS1 CONV fiber link via the add
fiber-link command.
2321 ABORT DS1 facility is not busied out. Busyout the DS1 facility via the busyout
ds1-facility command. If there is only one DS1 facility, then busyout the DS1
CONV circuit pack via the busyout board command.
2332 ABORT Test is not allowed to execute at th e far end with this system c o nfiguration
when there is only one DS1 facility available. Execute the test at the other end
of the DS1 CONV Complex.
Continued on next page
DS1 Facility
DS1CONV
A
. . .
.
.
.
.
.
.
.
.
.
.
.
. . .
Loop at internal interface
for the DS1 facility
DS1CONV
B
CSU
B
Test starts here
CSU
A