DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-719DUP-CHL (Duplication Interface)

9
Memory Shadowing Test (#876)

This test checks to see if memory writes in the ac tive SPE that occur within

shad owed add ress sp ace , can be su cce ssful ly sha dowe d into the s tandb y SPEs

memory

FAIL This test attempted to shadow a word with bad parity from the active SPE into
the standby SPE memory, but the expected remote SPE error interrupt from
detecting this bad parity word was not received in the active SPE.
1. Replace Duplication Interface comp onents starting with the standby
Duplication Interface circuit pack. Use SPE Duplication Channel
Component Replacement procedures at the end of this DUP-CHL section.
54 FAIL The attempt to turn on memory shadowing in this DUPINT circuit pack could
not be verified in the DUPINT hardware status register.
1. Replace Duplication Interface comp onents starting with the standby
Duplication Interface circuit pack. Use SPE Duplication Channel
Component Replacement procedures at the end of this DUP-CHL section.
PASS The test successfully created an Remote SPE Error interrupt.
Table 9-278. TEST #875 Remote SPE Error Interrupt Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page