DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1051MET-LINE (MET Line)

9
MET Line Station Lamp Updates Test (#60)

For this test, the software lights the lamps on the terminal b ased on the status

record contained in the processor. The lamp update s run only if the station is

in-service.

PASS Hybrid Circuit and Conference Circuit Test passed. The hybrid circ uitry is
transmitting properly.
1. If complaints persist, investigate by using other port tests, and b y examining
the station, wiring, and connections.
0NO
BOARD The test could not relate the internal ID to the port (no board). This could be due
to incorrect translations, no board is inserted, an incorrect board is inserted, or an
insane board is inserted.
1. Check to ensure that the board translations are correct. Use the list config
command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the busyout
board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the linkage
between the internal ID and the port. If this is not the case, check to ensure
that there is a valid board inserted.
Table 9-417. TEST #60 MET Line Station Lamp Updates Test
Error
Code Test
Result Description/ Recommendation
1 ABORT This port may have been busied out.
1. Look in the Error Log for Error Type 18 (port busied out) for this port. If this
error type is present, then rel e ase the port via the release station
<extension> command and run the test again.
2. Make sure that the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 9-416. TEST #57 Hybrid Circuit and Conference Circuit Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page