DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1093MODEM-PT (Modem Pool Port)

9
Modem Pool Audit Test (#99)

This audit updates the Modem Pool conversion resource status contained in the

TN758 Pooled Modem circuit pac k’s microprocessor . It does not actually test the

Pooled Modem circuit p ack; therefore, there are no FAIL codes. The audit can

only be performed on idle conversion resources. If the conversion resource is in

use, the audit will abort

2323 ABORT The Maintenance Test circuit pack digital port allocated for this test did not
disconnect properly. This error is more closely related to the Maintenance Test
circuit pack digi tal p ort used for this test than the TN758 Pooled Modem circuit
pack itself. Therefore, any hardware testing or replacement activities will focus
on the Maintenance Test circuit pack.
1. Wait 1 minute and attempt the test again a maximum of 5 times.
2324 ABORT The digital portion of the tested Modem Pool port did not disconnect properly.
1. Wait 1 minute and attempt the test again.
2. If the test continues to abort, replace the Pooled Modem circuit p ack and
retest.
2325 FAIL The Modem Pool port did not respond with an on-hook message when the
connection to the TN711 Maintenance/Test digital port was broken, indicating a
likely problem with the TN758 Pooled Modem circuit pack.
1. Busy-out both of the TN758 Pooled Modem conversion resources on the
circuit pac k containing the failin g conversion resource .
2. If the test continues to fail, replace the Pooled Modem circuit pack and
retest.
FAIL The Looparound Test failed, the loop-back data did not match the original d ata.
1. Repeat Test #98.
2. If the test fails again, replace the Pooled Modem circuit pack.
PASS The port can correctly transmit/receive data.
Table 9-433. TEST #98 Modem Pool Conversion Resource
Looparound Test — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page