DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures

9-1453SNI-BD (SNI Circuit Pack)

9
SNI Destructive Facility Test (#757)
This test is destructive.

The SNI runs a destructive looparound of the off-b oard and on-board

looparounds. This test returns the result of the on-board looparound, while test

756 returns the result of the off-board loop around.

Table 9-561. TEST #757 SNI Destructive Facility Test
Error
Code Test
Result Description/ Recommendation
1015 ABORT The system will not allow this test to be run because the SNI circuit pack has
not been busied out. Busy out the SNI circuit pack with busyout board.
Repeat the test board UUCSS long command.
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 3 times.
2300 ABORT The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals a maximum of 3 times.
2301 ABORT The software timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals a maximum of 3 times.
2304 ABORT SNI circuit pack responded that it is not able to run the test requested by
software.
1. Retry the command at 1-minute intervals a maximum of 3 times.
Continued on next page