DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126 Issue 4
June 1999
Maintenance Object Repair Procedures
9-168ATM-EI (Expansion Interface Circuit Pack)
9
Critical Reliability
There are 2 ATM-EI circuit packs in the PPN, 2 in the EPN.
1. Enter status pnc at the DEFINITY SAT. If the board is on the active side,
enter reset pnc interchange to switch the active ATM-EI board to the
standby side.
2. Enter busyout pnc-standby.
3. Enter busyout atm-pnc

a-pnc

or

b-pnc

.
4. Replace the circuit p ack.
5. Enter release atm pnc.
6. Enter release pnc-standby.
7. Wait 2.5 minutes for board insertion (firmware dow nload).
8. Enter test board UUCSS and verify that all tests pass.
Basic ATM PNC administration
NOTE:
This section contains basic administration information only. Refer to

DEFINITY ECS Installation, Upgrade, and Administration for ATM

for more
detailed information.
ATM PNC connections involve administering
1 ATM-EI board in each Port Network (Standard Reliability)
2 ATM-EI boards in the PPN; 1 in each EPN (High Reliability)
2 ATM-EI boards in every Port Network; 1 in each EPN (Critical Reliability)
Adding ATM PNC connections
Standard Reliability
1. If the ATM PNC EI circuit pack is not present or if the circui t pack is
present but is in an EPN, use the change circuit-pack command to ad d
circuit pack translation.
2. Enter add atm pnc
n
(connection number), and administer the circuit
pack location and ATM address.
Critical Reliability
1. Enter change system-parameters duplication and change the Enable
Operation of PNC Duplication field to n.