9-1357RING-GEN

9
Analog Ring Generator Query Test (#118)

The Analog Ring Generator Query Test requests the active Tone/Clock circuit

pack to check the ringing voltage. The tone/clock circuit p ack replies with PASS if

the ringing voltage is ad equate to ring the analog phones. If not, the active

tone/clock circ uit pack replies with a FAIL.

Table 9-536. TEST #117 Analog Ring Generator Initialization Test
Error
Code Test
Result Description/ Recommendation
1
1000
1001
1003
1115
2012
2100
ABORT The system software is unable to determine the active tone/clock circuit pack,
unable to allocated the resources necessary to run the test, or unable to send
a down link message.
1. Wait for the green LED on the active tone/clock to go out; use the status
port-network command to determine the active Tone/Clock circuit pack.
2. Rerun the test. If the test aborts again, refer to TDM-CLK.
2000 ABORT Response to the request was not received within the allowable time period .
1. Look for TDM-CLK errors and al arms. Resolve all other Tone/Clock
problems first.
2. Rerun the test.
PASS The active Tone/Clock has successfully been enabled to monitor the ringing
voltage level.
Table 9-537. TEST #118 Analog Ring Generator Query Test
Error
Code Test
Result Description/ Recommendation
1
1000
1001
1003
1115
2012
2100
ABORT Could not seize the resources to run the test. Other maintenance is running on the
active tone/clock circuit pac k.
1. Wait for the green LED on the active tone/clock circuit pack to go out; use the
status port-network command to determine the active Tone/Clock circuit pack.
2. Rerun the test. If the test aborts again, refer to TDM-CLK.
2000 ABORT Response to the request was not received within the allowable time period .
1. Look for TDM-CLK errors and alarms. Resolve all other tone/clock problems first.
2. Rerun the test.
Continued on next page